Design Guides

Full Stack SSR

  Create a Topology with EX-Switch and Mist AP for Wired/Wireless Assurance Lab   With this slight Lab modification, we can test the full-Stack End to End Solution for the Juniper enabled Branch. Naturally you need at minimum one additional EX-Switch (better two if you want to test VC as well) and if possible a...

High Availability – SSR

  Create a Topology with High-Avail Hub and Spoke 128T SSR Routers The following rules apply to SSR device based HA-Cluster configurations: The Interface names will follow the following pattern when you define them for each node: Node0=ge-0/0/x Node1=ge-1/0/x WAN Interfaces for HA-Hubs MUST have static IP-Addresses. So, you will define a WAN interface per...

Hub and Spoke WAN Edge deployment for SSR

In this chapter we describe an example of an implementation of SD-WAN with a typical Hub and Spoke scenario leveraging different transport technologies to show how it is implemented. Assume one builds a Lab to test this out before the actual roll-out happens. This is what you see then below. A Lab (simulating the real...