Design Guides

Full Stack SRX

  Create a Topology with EX-Switch and Mist AP for Wired/Wireless Assurance Lab   With this slight Lab modification, we can test the full-Stack End to End Solution for the Juniper enabled Branch. Naturally you need at minimum one additional EX-Switch (better two if you want to test VC as well) and if possible a...

High Availability SRX Example

Create a Topology with High-Avail Spoke and Hub SRX Routers With this Lab the Topology changes and reuses the 5 SRX’s in a different manner. Instead of 3 Spokes and 2 Hubs on each side we have devices forming a HA-Cluster. So, this scenario has one standalone and one HA-Clustered Spoke and an HA-Clustered Hub...

Hub and Spoke WAN Edge deployment for SRX

Here we describe an example of an implementation of SD-WAN with a typical Hub and Spoke scenario leveraging different transport technologies to show how it is implemented. Assume one builds a Lab to test this out before the actual roll-out happens. This is what you see then below. A Lab (simulating the real world) would...